Learn about our industrial building construction

15/1/2024

At GP Construcción we make our clients' projects a reality through engineering solutions and the construction of industrial buildings. We have collaborated with numerous companies creating customized spaces that meet the highest standards of quality and functionality.

We use the BMS system to control and monitor the construction of a ship.
‍We usethe BMS system to control and monitor the construction of a ship.

GP Construcción, solutions in industrial buildings  

We generate an integral solution for each industrial building construction. In each process we develop a design and construction structure with materials suitable for the project, guaranteeing resistance, durability and functionality. We adapt to the business plan of our clients, taking into account the execution time and type of contracting, ensuring that every detail is adjusted to their requirements. 

Steel is one of the main elements we use when building industrial buildings.
Steel is one of the main elements we use when building industrial buildings.

Construction of industrial buildings

Airport Hangars in Guadalajara, Jalisco - 31,709 m² (31,709 sq. mts.)

LEGO Mexico Operations in Ciénega de Flores, Nuevo León - 50,000 m² (50,000 sq.m.)

BMW Plant in San Luis Potosí, San Luis Potosí - 49,600 m² (49,600 sq. mts.)

Brembo Tequila Plant in Escobedo, Nuevo Leon - 31,000 m² (31,000 sq. mts.)

MAGNA Hot Stamping Plant in San Luis Potosí, San Luis Potosí - 76,300 sq. mts.

Michelin plant in Leon, Guanajuato - 140,000 m² (140,000 sq.m.)

Sungwoo Hitech Plant in Pesquería, Nuevo León - 124,000 m² (124,000 sq.m.)

Jumex Interpuerto in Salinas Victoria, Nuevo Leon - 48,700 sq. mts.

Caterpillar Plant in Ciénega de Flores, Nuevo León - 25,000 m² (25,000 sq.m.)

No items found.
Share this note

Build with us

Tell us more about your project requirements.

Contact us