Developing resilient and energy-efficient infrastructure solutions
Monterrey N.L. : 8,500m2: 2010- 2015
First LEED Silver awarded project in Nuevo León.
Reuse of 82% of the materials resulting from construction waste.
100% of the products used comply with organic compound limits so that they do not affect health.
Selection of native or adapted plants that require little water (49,000 plants and 157 trees).
Monterrey N.L. | 40,000m2 | 2010-2015
BBVA Stadium is the first soccer stadium in the Americas to receive LEED Silver certification.
Energy efficiency: installed medium and low voltage equipment that can help you achieve up to 30% energy savings.
Rehabilitation of more than 13 km of the Gran Parque Ecológico Río La Silla.
Smart building: the stadium is able to intelligently manage its electrical installation and control lighting systems.
For the electrical infrastructure, state-of-the-art equipment was installed, providing total safety under the most extreme constraints.
Salinas Victoria, N.L. | 53,000m2 | 2019-2022
From start to finish they had a selection of high-end materials that were environmentally friendly and met certain low VOC levels.
The building has insulation panels on the facade and roof to prevent the building from heating up.
The BMS (Building Management System) was implemented.
Ciénega de Flores, N.L. : 27,000m2: 2013- 2014
3,863 liters of potable water saved per day by using efficient sanitary fixtures and sensor mixer faucets.
BMS (Building Management System) control system that monitors the use of lighting, air conditioning, heating and water consumption systems.
Sustainable landscape or green areas that integrate species native to the region to reduce water consumption and are irrigated with treated water.
100% of the products used comply with organic compound limits so that they do not affect health.